WT 6 - Siemens SWT-2.3-93
This Windenergy Turbine was erected in April 2009. It is the first WT with a hybrid tower from ATS (Netherlands). 80 m of the tower consists of prefabricated concrete segments and 53 m of steel segments.
Specifications: | |
Nominal output | 2,300 kW |
Hub height | 133 m |
Rotor diameter | 93 m |
Control | Pitch (active blade angle adjustment) |
Further information:
www.siemens.com